KPIs · Utilization
The share of the shift the line was moving, including scrap time.
Utilization is the share of the shift the line was moving
Utilization is moving time divided by the scheduled window. Moving means the enabled bit is on, including time the line was making scrap.
Utilization is the share of the scheduled window that the line was moving. Moving means the enabled bit is on. On an 8 hour shift, 6.5 hours of moving time is 81% utilization.
That 81% includes time the line was moving and making scrap. Utilization asks whether the line was moving. It does not ask whether the product was good, and it does not ask whether the line ran at the planned speed.
Formula
Moving time divided by the scheduled window
Scheduled
8 h
The window you asked about
Moving
6.5 h
Enabled bit on
Stopped
1.5 h
Enabled bit off
Utilization
81%
6.5 / 8
How this sits next to the other numbers
Utilization is the availability piece of OEE. OEE still multiplies it by speed and by the share of units that were good. The time the line was not moving is downtime, including the short stops.
On the Uptime screen, the Uptime percent is productive time divided by the window. Productive time leaves out quality loss, the minutes the line was moving and the product was not good. Utilization adds those minutes back, because the line was still moving. Good time divided by moving time is productivity.
Check utilization on one shift
We will use the enabled bit to show moving time and stopped time for a window you pick.
See utilization on one line
Book a demo or start a Pilot. Bring the enabled bit from one line and the shift window you care about.