Skip to content
Pilot7 of 10 seats left
Setpoint
585-307-1508
All KPIs

KPIs · OEE

Three factors multiplied. A guess in any one of them makes the OEE number a guess.

OEE from availability, performance, and quality

Overall equipment effectiveness multiplies availability, performance, and quality. Availability comes from stopped time. Performance needs the planned speed. Quality needs the good count.

Overall equipment effectiveness (OEE) is three numbers multiplied. Availability is how much of the scheduled time the line was moving. Performance is how fast it ran compared with the rate you planned. Quality is how much of what it made was good.

On an example 8 hour shift, availability is 85%, performance is 92%, and quality is 96%. Multiply them and OEE is 75%. If the speed or the good count is a guess, that 75% is a guess too.

Formula

Availability, performance, and quality

Availability comes from stopped time. Performance needs the speed or the count versus the planned rate. Quality needs good units divided by total units.

Availability

85%

6.8 h moving / 8 h scheduled

Performance

92%

Actual speed vs the planned rate

Quality

96%

Good units / total units

OEE

75%

85% x 92% x 96%

Which PLC bits feed each factor

  1. 1

    Availability uses the enabled bit

    Stopped means the enabled bit is off, including a jam that lasts ninety seconds. Moving time divided by the scheduled window is availability. That share is also utilization. Uptime insights gets it from the enabled bit on the edge device.
  2. 2

    Performance needs a speed or a count

    The enabled bit does not say how fast the line ran. Log the speed tag or the total count, and compare it with the rate you planned for that product.
  3. 3

    Quality needs a good count, or a running bit that means good product

    Good units divided by total units is the quality factor. When the running bit means good product, time that is enabled and running is good time, and time that is enabled but not running is quality loss. That split is productivity until you have the counts.

Bring one shift of enabled, running, and speed

We will split the shift into moving, good, and stopped time, then show which OEE factor those tags can fill in.

Setpoint

Start from the two bits, then add the rate

Log line enabled and line running, and add the speed or the count for the product you planned. Read the true cost of unplanned downtime for the short stops that move availability, and the guide on downtime from PLC signals.

See the three OEE factors on one line

Book a demo or start a Pilot. Bring the enabled bit, the running bit, and a speed or count from one line.