Skip to content
Pilot7 of 10 seats left
Setpoint
585-307-1508

Contact

Let’s talk industrial data.

From edge deployment to cloud integration, we’re here to help you make the most of Setpoint. Tell us about your plant and we’ll set up a demo around the equipment and problems you actually have.

  • 30-minute walkthrough

    A live tour of dashboards, insights, alarms, and AI Chat on sample data from your industry.

  • Bring a tag list

    Share a PLC tag list and we will show how your assets map into Blueprints.

  • A written quote

    Pricing sized to your lines, devices, and sites, plus a plan for connecting the first line.

Call or text an engineer585-307-1508

Before the call

See how a tag list becomes assets.

Walk through a scrubbed process unit export tip by tip, or paste a plain-text tag list to preview structure in your browser. Nothing is uploaded from this page.

Structure from a tag list

Step 1 of 5 · Start with the export

Sample data

Optional: paste your own tag list

Plain text only, one tag per line. Runs in your browser. Or keep the sample and scan the tags below.

Start with the export

A PLC export is a flat tag list. This walkthrough uses process unit equipment names. Messy abbreviations are normal. Or paste your own list below.

PLC tag list · ReactorA_Process.txt

Process unit sample ready

Reactor temps and pressures, flow rates, valve states, and analyzer readings from a continuous process unit. Or paste your own list above.

Setpoint / Line 3 / Assets

Sample data

Assets

Waiting on structure

Asset tree appears after clustering

Use the tip above and continue when you are ready — the walkthrough will not skip ahead on its own.

18 tags · 4 families · 7 assets

Paste a list above, or bring a tag list to the call.