Built for plants that run on heat, speed, and uptime.

Setpoint is used wherever PLCs drive production. Here is how it maps to the problems in your part of manufacturing.

Plastics & extrusion

Hold every zone on target, every shift.

Extruders and molding presses live and die by barrel temperatures and line speed. Setpoint watches every zone and every start-up.

The challenge

  • Heater bands that all switch on at once drive peak demand
  • Nobody can say what heating a line actually costs per year
  • Scrap during start-up is hard to quantify
  • Zone drift is noticed only after a quality complaint

With Setpoint

  • Heater insights turn heater energy into projected annual electricity cost at your rate
  • Stagger recommendations come with an estimated dollar savings per year
  • Uptime insights separate productive time from quality-loss running
  • Predictive signals catch slowing warm-up and oscillating zones early
Signals we watch:Barrel zone tempsScrew RPMMelt pressureLine enabled / running

Setpoint / Plant 2 / Heater insights

Sample data

Heater insights

Plant 2 · 4 linesLast 30 days

Start-up load · simultaneous vs staggered

Stagger candidate
TodayStaggered start

Cost & savings — Plant 2

$0.12 / kWh30-day windowhigh confidence
Rolled up from 4 of 4 edge devices at this site.
Projected annual electricity cost
$107.46K
$294.4 / day · 895.47 MWh / yr
Extrapolated from 73.60 MWh over the selected 30-day window.
Identified annual savings opportunity
$13,286
~9.10 MWh this window · 12.4% of usage
From staggering heater starts and tightening preheat timing — see recommendations below.
Energy this window
73.60 MWh
Estimated (thermal) basis
Cost this window
$8,832
at $0.12 / kWh
Avg cost per day
$294.4
2.45 MWh / day
CO₂ this window
29.44 t CO₂
358.19 t CO₂ / yr

Savings opportunities

Stagger heater starts within each asset group
~$13,286 / yr

Several heaters often heat up in the same buckets — staggering start times may reduce peak demand. Highest-overlap asset groups: Line 3 (82/100), Line 1 (64/100), Line 4 (51/100). Stagger starts within each asset group — heaters on different asset groups don't need to coordinate.

~9.10 MWh this window ($1,092)

Uneven preheat timing

First crossing of ~85% of typical temperature spans up to 1.6 hours across heaters in the same asset group — align start times with true production-ready needs. Largest spread is within Line 1 (1.6 h). Preheat timing is compared within each asset group — heaters on different asset groups don't need to start together.

Metals & heat treating

See where the energy actually goes.

Furnaces, ovens, and induction lines are energy-hungry. Setpoint connects heating data to output so you can cut cost without risking spec.

The challenge

  • Energy bills with no line-level breakdown
  • Heating elements age quietly until they fail
  • Recipe changes are not compared run over run

With Setpoint

  • Heater insights estimate energy per asset group and highlight stagger candidates
  • Warm-up slope tracking points to element or supply issues
  • Tag insights compare temperatures and soak times by recipe
Signals we watch:Furnace zone tempsHeater output %Recipe / part numberSoak timers

Setpoint / Plant 1 / Insights

Sample data

Insights

Group by: Load IDLast 2 days

Recent Load ID— Heat treat

3 unusual vs recent

Summary by Load ID

Detail
L-2047
7.0 h
L-2046
7.0 h
L-2045
7.0 h
L-2044
7.0 h
L-2043
7.0 h
L-2042
7.0 h
L-2041
7.0 h
Furnace 2
Cycle · 3 tags
Door Closed
96% on
96% on
96% on
96% on
96% on
96% on
96% on
Recipe
4140 Q&T
4140 Q&T
4140 Q&T
4140 Q&T
4340 Q&T
4140 Q&T
4140 Q&T
Soak Time
min
90.00 min
90.00 min
90.00 min
90.00 min
120.0 minunusual
90.00 min
90.00 min
Quench · 1 tag
Oil Temperature
°F
140.3 °F
132.7 – 146.5
142.8 °F
135.2 – 149.0
143.3 °F
135.7 – 149.5
141.8 °F
134.2 – 148.0
145.3 °F
137.7 – 151.5
140.8 °F
133.2 – 147.0
144.3 °F
136.7 – 150.5
Zone 1 · 2 tags
Output
%
58.07 %
53.50 – 92.20
60.57 %
56.00 – 94.70
61.07 %
56.50 – 95.20
59.57 %
55.00 – 93.70
63.07 %
58.50 – 97.20
58.57 %
54.00 – 92.70
62.07 %
57.50 – 96.20
Temperature Actual
°F
1,538 °F
1,404.5 – 1,550.3
1,540.5 °F
1,407 – 1,552.8
1,541 °F
1,407.5 – 1,553.3
1,539.5 °F
1,406 – 1,551.8
1,543 °F
1,409.5 – 1,555.3
1,538.5 °F
1,405 – 1,550.8
1,542 °F
1,408.5 – 1,554.3
Zone 2 · 2 tags
Output
%
65.43 %
61.60 – 92.60
85.61 %unusual
82.10 – 100.0
62.43 %
58.60 – 89.60
63.93 %
60.10 – 91.10
60.43 %
56.60 – 87.60
64.93 %
61.10 – 92.10
61.43 %
57.60 – 88.60
Temperature Actual
°F
1,542.9 °F
1,399.7 – 1,555.3
1,514.4 °Funusual
1,371.2 – 1,526.8
1,539.9 °F
1,396.7 – 1,552.3
1,541.4 °F
1,398.2 – 1,553.8
1,537.9 °F
1,394.7 – 1,550.3
1,542.4 °F
1,399.2 – 1,554.8
1,538.9 °F
1,395.7 – 1,551.3

Average by Load ID

Food & beverage

Batch-by-batch visibility, without the clipboards.

From cook kettles to packaging lines, Setpoint logs every batch parameter and keeps it tied to the product you were running.

The challenge

  • Batch records live on paper or in disconnected HMIs
  • Hard to prove a parameter held for the whole run
  • Utilities and HVAC data sit in a separate building system

With Setpoint

  • Tag insights summarize every signal for each batch or product code
  • Warning and critical alarms on the limits you define for each parameter
  • BACnet and KNX connections bring facility data into the same view
Signals we watch:Kettle tempsBatch IDFlow totalsRoom temperature & humidity

Setpoint / Plant 2 / Alarms

Sample data

Active Alarms (4)

All sites
  • CRITICAL

    Line3.Melt.Pressure

    Line 3 · Extruder · 3,420 psi > 3,300

    Pressure

    2 min ago

  • WARNING

    Line3.Zone7.Temp

    Line 3 · Zone 7 · 201 °C < 210

    Temperature

    14 min ago

  • WARNING

    Press4.Bearing.Vib

    Press cell A · Press 4 · 7.1 mm/s > 6.5

    Vibration

    41 min ago

  • CRITICAL

    Chiller2.Return.Temp

    Utilities · Chiller 2 · 19.8 °C > 18

    Temperature

    1 h ago

Packaging & converting

Turn downtime into a number you can manage.

High-speed lines lose minutes in small stops. Setpoint makes every stop and slow-down visible by line, shift, and day.

The challenge

  • Micro-stops never make it into the shift report
  • Running time is not the same as good-product time
  • Every line reports uptime a little differently

With Setpoint

  • Uptime insights classify time as productive, quality loss, or stopped
  • Consistent definitions across every line and site
  • Daily rollups ready for the morning production meeting
Signals we watch:Line enabledLine runningSpeedReject counts

Setpoint / Plant 2 / Uptime insights

Sample data

Uptime insights

Plant 2 · 4 linesLast 7 days
ProductiveQuality lossStoppedUnknown

Productive is enabled and running. Quality loss is moving but not good material. Stopped is not enabled.

Uptime
85.1%
productive / window
Quality yield
91.0%
good / time moving
Stopped
11.0 h
6.6%
Quality loss
14.1 h
moving, not good material
Unknown
0.0 h
0.0%

State timeline

ProductiveQuality lossStoppedUnknown

Automotive & discrete

Many cells, many PLC brands, one picture.

Mixed fleets of Rockwell, Siemens, and Beckhoff controllers are normal. Setpoint speaks to all of them and models each cell the same way.

The challenge

  • Different controller vendors on every line
  • Tag naming that varies from cell to cell
  • Engineering time spent wiring up dashboards

With Setpoint

  • One connection layer across Rockwell, Siemens, Beckhoff, and open protocols
  • Frames and tag patterns standardize similar cells in minutes
  • Edge devices per cell, managed from one central server
Signals we watch:Cycle timesFault codesStation statesTorque & press force

Setpoint / Connections / New connection

Sample data

New connection

PLCDatabaseMedia

Allen-Bradley / Rockwell

ControlLogix / CompactLogix · EtherNet/IP · DF1

Siemens

S7 · PROFINET

Beckhoff

ADS / TwinCAT

Emerson

DeltaV

Open protocols

Modbus TCP · OPC UA · CANopen · Open Protocol

Building automation

BACnet/IP · KNXnet/IP

SQL databases

PostgreSQL · MySQL · SQL Server

Media

Watched image folders

Chemicals & process

Long-horizon data, kept and queryable.

Continuous processes need years of history. Setpoint archives every logged row to Parquet so compliance and analytics teams always have it.

The challenge

  • Historian licenses that scale with tag count
  • Data trapped on-site for audits and investigations
  • Process engineers waiting on IT for exports

With Setpoint

  • DeltaV and OPC UA connections into a modern time-series store
  • Automatic Parquet archive to local disk and cloud object storage
  • AI Chat and the REST API answer questions without a ticket
Signals we watch:Reactor temps & pressuresFlow ratesValve statesAnalyzer readings

Setpoint / AI Chat

Sample data

AI Chat

Context: Line 3
Why was Line 3 down so much on Wednesday?

Line 3 was stopped for 3.7 h on Wednesday, about twice its weekly average. Most of it came from two events:

  • 06:10–07:35 · start-up after a die change. Zone 7 took 38 min longer than usual to reach setpoint.
  • 14:02–15:20 · melt pressure went high and the operator disabled the line.

Zone 7 also shows a slowing warm-up in Heater insights. Want me to pull its temperature trend for the week?

AI Assistant
Ask about your sites, assets, or logged data…

Don’t see your industry?